Sunday, October 12, 2008

The kitchen...





The kitchen is now 90% finished. The only part left is the crown moulding and the far right wall, which will be finished once I'm done with the wiring for the lights in the bathroom. This "faux" wall will be adhered to the surface with double-sided tape so that it can be removed to service the electrical system if needed. It will look like and blend in with the rest of the room. The icebox next to the sink is a gift to Virginia from me to complete the room.

No comments: